Each system is specified by surface, not by sales pitch. Find the surface you have and read exactly what we do to it.
Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.
Read more HEATReflective cool coating that turns back over 85% of solar radiation and cuts slab temperature by 6–8°C.
Read more GIRust treatment, seam sealing and coating for corrugated galvanised iron warehouse and factory roofs.
Read more ACCemented A.C. sheet sealing that stops seepage at the overlaps without replacing a single sheet.
Read more TANKPolymerised cementitious coating for overhead and underground concrete tanks. Safe with drinking water.
Read more FDNExternal basement waterproofing in bituminous, styrene-acrylic or crystalline coating, chosen by soil condition.
Read more BATHTwo-component ZEM Guard 209, taped joints, drain injection and a flood test before flooring goes back down.
Read more DIYThe same coatings sold by the pail with application instructions, for owners and contractors applying it themselves.
Read more Area, scope and turnaround exactly as recorded at handover.
| Client | Scope | Covered area | Duration | Handover |
|---|---|---|---|---|
| Frontier Corps South BalochistanTurbat, Balochistan | Roof waterproofing + heat-proof coating18 buildings | 68,000 sq.ft | 22 days | Feb 2020 |
| Pakistan Rice ComplexS.I.T.E. 2, Karachi | G.I. sheet waterproofingWarehouse | 28,000 sq.ft | 22 days | Jun 2019 |
| State Life InsuranceI.I. Chundrigar Road, Karachi | Roof waterproofing + heat-proof coating3 buildings | 26,000 sq.ft | 18 days | Sep 2021 |
| Fintex ManufacturingH.I.T.E., Hub | G.I. sheet waterproofingWarehouse | 14,000 sq.ft | 12 days | Aug 2020 |
| Hassan TextilesNew Karachi Industrial Area | Cemented asbestos sheet waterproofingTextile CMD | 9,400 sq.ft | 14 days | Sep 2020 |
Tell us the surface and roughly how many square feet. A surveyor visits, checks the site properly, and you get a written quotation — no obligation.