Overhead and underground concrete tanks develop seepage at construction joints and hairline cracks well before the structure itself is at risk. We seal the tank from the inside with a coating rated safe for potable water once cured.
Water tank waterproofing in Karachi deals with two risks at once — structural seepage at the wall-to-floor construction joint, and water quality, since anything applied inside a tank eventually touches what people drink. Zem Chemicals drains and cleans the tank first, cuts and tapes every construction joint and crack, then applies a potable-safe polymerised cementitious primer and two coats, detailing internal corners and pipe penetrations separately before refilling and holding the tank for a flood check. Underground tanks are treated through the existing access point with no excavation needed, and the same below-grade cementitious approach carries over to our basement and foundation waterproofing work. Typical tanks are back in service in 3–8 working days — see completed water tank projects or send us your tank's details for a written quotation.
Skipping a stage is how a waterproofing job fails in year two. This sequence is not negotiable on our sites.
Tank drained and every joint, crack and pipe penetration inspected before we quote a system.
Every construction joint and crack cut, cleaned, packed and taped.
Potable-safe cementitious system applied and allowed to cure fully before refilling.
Tank refilled and held to confirm the seal before we sign off.
Yes — once fully cured, the system is rated safe for contact with potable water. We hold the correct cure time before the tank goes back into service.
Typically 3–8 working days depending on tank size and cure time between coats — we confirm the exact window on survey.
No. We work from inside the tank through the existing access point; excavation is not required for this treatment.
The seal takes effect once the coating has cured and the tank is refilled — we explain the exact timeline for your tank before work starts.
| Client | Scope | Covered area | Duration | Handover |
|---|---|---|---|---|
| Frontier Corps South BalochistanTurbat, Balochistan | Roof waterproofing + heat-proof coating18 buildings | 68,000 sq.ft | 22 days | Feb 2020 |
| Pakistan Rice ComplexS.I.T.E. 2, Karachi | G.I. sheet waterproofingWarehouse | 28,000 sq.ft | 22 days | Jun 2019 |
| State Life InsuranceI.I. Chundrigar Road, Karachi | Roof waterproofing + heat-proof coating3 buildings | 26,000 sq.ft | 18 days | Sep 2021 |
| Fintex ManufacturingH.I.T.E., Hub | G.I. sheet waterproofingWarehouse | 14,000 sq.ft | 12 days | Aug 2020 |
| Hassan TextilesNew Karachi Industrial Area | Cemented asbestos sheet waterproofingTextile CMD | 9,400 sq.ft | 14 days | Sep 2020 |
Tell us the surface and roughly how many square feet. A surveyor visits, checks the site properly, and you get a written quotation — no obligation.
Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.
Read more HEATReflective cool coating that turns back over 85% of solar radiation and cuts slab temperature by 6–8°C.
Read more GIRust treatment, seam sealing and coating for corrugated galvanised iron warehouse and factory roofs.
Read more ACCemented A.C. sheet sealing that stops seepage at the overlaps without replacing a single sheet.
Read more