Corrugated galvanised iron roofs fail at the overlaps, the fasteners and the rust line — not across the middle of the sheet. We treat all three, then coat the whole roof so it stops corroding from the top down.
G.I. sheet waterproofing in Karachi is less about the sheet itself and more about where it joins — corrugated galvanised iron almost never fails across the open span, it fails at the overlaps, the screw and J-bolt fasteners, and the rust line creeping out from a cut edge. Zem Chemicals treats all three in sequence: rust removal and conversion on every affected area, every overlap and fastener resealed with reinforced tape, then a full-surface coating that also turns the roof reflective — the same finish behind our roof heat proofing service, which is why warehouse clients routinely get both done in one visit. The largest G.I. job on record is 28,000 sq.ft at Pakistan Rice Complex in S.I.T.E. 2, handed over in 22 working days — see more completed G.I. sheet waterproofing jobs or send us your roof's covered area for a written quotation.
Skipping a stage is how a waterproofing job fails in year two. This sequence is not negotiable on our sites.
We assess corrosion level sheet by sheet and flag anything that needs replacing rather than coating.
Scaling, cleaning and rust conversion, with safe access arranged for the crew.
Overlaps, screws and junctions sealed with reinforced fabric or Fibermesh before the field coat.
Coating applied across the whole roof to seal it against water.
Often yes, if the sheet still has structural section left. Where corrosion has gone through, we tell you which sheets need replacing before we coat — we will not coat over a sheet that is finished.
No. We work from above and schedule around your shifts. Most warehouse jobs run with operations continuing underneath.
28,000 sq.ft of warehouse roof at Pakistan Rice Complex, S.I.T.E. 2, was completed in 22 working days.
Yes. G.I. sheets radiate heat straight down into the shed. The reflective finish measurably drops interior temperature.
| Client | Scope | Covered area | Duration | Handover |
|---|---|---|---|---|
| Frontier Corps South BalochistanTurbat, Balochistan | Roof waterproofing + heat-proof coating18 buildings | 68,000 sq.ft | 22 days | Feb 2020 |
| Pakistan Rice ComplexS.I.T.E. 2, Karachi | G.I. sheet waterproofingWarehouse | 28,000 sq.ft | 22 days | Jun 2019 |
| State Life InsuranceI.I. Chundrigar Road, Karachi | Roof waterproofing + heat-proof coating3 buildings | 26,000 sq.ft | 18 days | Sep 2021 |
| Fintex ManufacturingH.I.T.E., Hub | G.I. sheet waterproofingWarehouse | 14,000 sq.ft | 12 days | Aug 2020 |
| Hassan TextilesNew Karachi Industrial Area | Cemented asbestos sheet waterproofingTextile CMD | 9,400 sq.ft | 14 days | Sep 2020 |
Tell us the surface and roughly how many square feet. A surveyor visits, checks the site properly, and you get a written quotation — no obligation.
Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.
Read more HEATReflective cool coating that turns back over 85% of solar radiation and cuts slab temperature by 6–8°C.
Read more ACCemented A.C. sheet sealing that stops seepage at the overlaps without replacing a single sheet.
Read more TANKPolymerised cementitious coating for overhead and underground concrete tanks. Safe with drinking water.
Read more