For owners and contractors who want to apply the system themselves — the identical water-based, non-toxic primer and top coat our own crews use on-site, with coverage rates and application steps included.
Waterproofing chemicals bought directly from Zem Chemicals are not a separate, lesser product — it's the identical water-based, non-toxic primer and polymerised top coat our own crews apply on real jobs, sold by the 4 kg, 20 kg or 200 kg pail with the dilution ratio and coverage rate worked out for your exact area rather than a generic label instruction. The same chemistry covers wet areas too — bathroom waterproofing jobs use the identical ZEM Guard 209 coating available this way — and the reflective roof-cooling version is sold separately as ZEM-30 Heat Shield. Every pail comes with step-by-step primer-then-topcoat instructions and a WhatsApp number for questions mid-job; if you'd rather not do it yourself, the same system is available as a professional crew visit instead.
Full specs, coverage rate and where it's used
Skipping a stage is how a waterproofing job fails in year two. This sequence is not negotiable, whether our crew applies it or you do.
Send your covered area on WhatsApp and we work out exactly how many pails and how much primer you need.
Surface swept clean of dust and loose material, cracks filled, then primer applied and left to dry.
Applied at the stated dilution, second coat once the first has dried through.
The finished coat needs a dry window before rain or standing water — we tell you exactly how long for your weather.
Yes — a small roof or bathroom is a realistic one-person, one-weekend job with a roller and a brush for the details. Larger areas go faster with two people.
Message us the batch and area on WhatsApp before you mix — it takes two minutes and avoids redoing the job. We would rather answer that question than sell you a pail that fails.
Yes, identical formulation, just sold by the pail instead of applied by our team.
Both — pickup from our Gulshan-e-Iqbal office, or delivery across Karachi for larger orders. Ask on WhatsApp for your area.
| Client | Scope | Covered area | Duration | Handover |
|---|---|---|---|---|
| Frontier Corps South BalochistanTurbat, Balochistan | Roof waterproofing + heat-proof coating18 buildings | 68,000 sq.ft | 22 days | Feb 2020 |
| Pakistan Rice ComplexS.I.T.E. 2, Karachi | G.I. sheet waterproofingWarehouse | 28,000 sq.ft | 22 days | Jun 2019 |
| State Life InsuranceI.I. Chundrigar Road, Karachi | Roof waterproofing + heat-proof coating3 buildings | 26,000 sq.ft | 18 days | Sep 2021 |
| Fintex ManufacturingH.I.T.E., Hub | G.I. sheet waterproofingWarehouse | 14,000 sq.ft | 12 days | Aug 2020 |
| Hassan TextilesNew Karachi Industrial Area | Cemented asbestos sheet waterproofingTextile CMD | 9,400 sq.ft | 14 days | Sep 2020 |
Tell us the surface and roughly how many square feet. Whether you apply it yourself or our crew does, you get a written quotation — no obligation.
Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.
Read more HEATReflective cool coating that turns back over 85% of solar radiation and cuts slab temperature by 6–8°C.
Read more GIRust treatment, seam sealing and coating for corrugated galvanised iron warehouse and factory roofs.
Read more ACCemented A.C. sheet sealing that stops seepage at the overlaps without replacing a single sheet.
Read more