Cemented asbestos roofing sheets crack at the fastener holes and lift at the overlaps long before the sheet itself fails. We seal both, then coat the whole roof — no sheet replacement, no drilling into the cement.
Asbestos sheet waterproofing in Karachi exists because cemented A.C. roofing sheets usually crack at the fastener holes and lift at the overlaps years before the sheet material itself gives out — replacing sound sheets at that point is wasted cost. Zem Chemicals seals both failure points without drilling into the cement or swapping a single sheet: hairline cracks sealed individually, every overlap resealed with reinforced tape, then a full-surface coating applied across the roof. It's the same overlap-sealing approach used next door on G.I. sheet roofs in the same industrial estates — recent work includes 9,400 sq.ft at Hassan Textiles in New Karachi Industrial Area, handed over in 14 working days. See more completed asbestos sheet waterproofing jobs or send us your roof's covered area for a written quotation.
Skipping a stage is how a waterproofing job fails in year two. This sequence is not negotiable on our sites.
We check every sheet for structural condition before quoting — a sheet that has failed structurally gets flagged for replacement, not coated over.
Every fastener hole and hairline crack sealed individually, without drilling into the cement sheet.
Coating applied across the whole roof so ageing sections are protected along with the damaged ones.
Sections checked for remaining seepage, then written warranty.
Yes — our treatment coats and seals the existing sheet without cutting, drilling or disturbing the cement, which is where any asbestos fibre risk would come from. Nothing is ground down or removed.
No. Fastener holes and cracks are sealed from the surface, not re-drilled or enlarged.
9,400 sq.ft of cemented asbestos sheet roof at their New Karachi Industrial Area unit was completed in 14 working days.
Yes. The same reflective top system used on our roof heat proofing service can be applied over this treatment.
| Client | Scope | Covered area | Duration | Handover |
|---|---|---|---|---|
| Frontier Corps South BalochistanTurbat, Balochistan | Roof waterproofing + heat-proof coating18 buildings | 68,000 sq.ft | 22 days | Feb 2020 |
| Pakistan Rice ComplexS.I.T.E. 2, Karachi | G.I. sheet waterproofingWarehouse | 28,000 sq.ft | 22 days | Jun 2019 |
| State Life InsuranceI.I. Chundrigar Road, Karachi | Roof waterproofing + heat-proof coating3 buildings | 26,000 sq.ft | 18 days | Sep 2021 |
| Fintex ManufacturingH.I.T.E., Hub | G.I. sheet waterproofingWarehouse | 14,000 sq.ft | 12 days | Aug 2020 |
| Hassan TextilesNew Karachi Industrial Area | Cemented asbestos sheet waterproofingTextile CMD | 9,400 sq.ft | 14 days | Sep 2020 |
Tell us the surface and roughly how many square feet. A surveyor visits, checks the site properly, and you get a written quotation — no obligation.
Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.
Read more HEATReflective cool coating that turns back over 85% of solar radiation and cuts slab temperature by 6–8°C.
Read more GIRust treatment, seam sealing and coating for corrugated galvanised iron warehouse and factory roofs.
Read more TANKPolymerised cementitious coating for overhead and underground concrete tanks. Safe with drinking water.
Read more