0332-0066625
HEAT

Roof heat proofing that measurably drops indoor temperature

A reflective, UV-stable top coat that turns back more than 85% of incoming solar radiation instead of letting the slab absorb it. Measured 6–8°C lower surface temperature on real Karachi roofs in June.

BARE SLAB heat absorbed, radiates down
85% REFLECTED 6–8°C cooler surface
⇆
Before · bare, absorbingAfter · reflective coat
Roof surface, drag to compare
Roof heat proofing in Karachi

What actually happens when a roof gets heat-proofed

Roof heat proofing in Karachi is a separate system from waterproofing, even though most clients end up getting both — a reflective, UV-stable top coat that turns back more than 85% of incoming solar radiation instead of letting the slab absorb it, measured at 6–8°C lower surface temperature on real Karachi roofs in June, not a lab figure. It applies over R.C.C., G.I. and asbestos sheet roofs alike, either together with roof waterproofing in the same visit or afterward on a roof that's already sealed. The same reflective chemistry is sold by the pail as ZEM-30 Heat Shield for owners who want to apply it themselves. Send us the roof's covered area and a surveyor confirms which system fits before any quotation is written.

The problem

What an untreated roof costs you every summer

  • Top-floor rooms running visibly hotter than the rest of the house
  • AC compressors running longer through the day and failing sooner
  • The slab absorbing heat all day and releasing it well into the night
  • G.I. and asbestos sheet sheds turning into ovens by early afternoon
  • Energy bills climbing every June without the building itself changing
The treatment

What the reflective system does

  • Two coats of a UV-stable reflective top system over a sound or freshly waterproofed roof
  • Measured to turn back more than 85% of incoming solar radiation
  • Surface temperature recorded before and after, on the job sheet
  • Compatible with our RCC, G.I. and asbestos waterproofing systems — applied together or afterward
  • No colour fade for the stated warranty period
How the job runs

Four stages, in this order, every time

Skipping a stage is how a waterproofing job fails in year two. This sequence is not negotiable on our sites.

Survey

Rooftop temperature reading

We measure the existing surface temperature at midday before quoting, so the before/after comparison is real, not estimated.

Preparation

Cleaning and priming

Surface cleaned and primed so the reflective coat bonds properly, whatever the underlying material.

Application

Two reflective coats

Applied evenly across the full roof, each coat allowed to cure before the next.

Handover

Re-measured and logged

Surface temperature measured again in full sun and the drop recorded on the job sheet.

Questions we get asked

Roof heat proofing — the practical answers

Does heat-proofing replace waterproofing?

No — they solve different problems. Heat-proofing reflects solar radiation; waterproofing seals against rain. We usually recommend both together, but heat-proofing alone can go over an already-sound, dry roof.

How long does the reflective finish last?

The system is UV-stable and rated not to fade or lose reflectance for the stated warranty period, checked on our routine site visits.

Can it go over an existing coat?

In most cases yes, once we have checked the existing coat is sound and properly bonded. We confirm this on survey before quoting.

Does it work on G.I. and asbestos sheets, not just concrete?

Yes. The same reflective system applies over G.I. and asbestos sheet roofs and is often the single biggest comfort improvement for a warehouse or shed.

Completed job sheets

Recent work

All projects
ClientScopeCovered areaDurationHandover
Frontier Corps South BalochistanTurbat, BalochistanRoof waterproofing + heat-proof coating18 buildings68,000 sq.ft22 daysFeb 2020
Pakistan Rice ComplexS.I.T.E. 2, KarachiG.I. sheet waterproofingWarehouse28,000 sq.ft22 daysJun 2019
State Life InsuranceI.I. Chundrigar Road, KarachiRoof waterproofing + heat-proof coating3 buildings26,000 sq.ft18 daysSep 2021
Fintex ManufacturingH.I.T.E., HubG.I. sheet waterproofingWarehouse14,000 sq.ft12 daysAug 2020
Hassan TextilesNew Karachi Industrial AreaCemented asbestos sheet waterproofingTextile CMD9,400 sq.ft14 daysSep 2020

Send us the covered area. We will handle the rest.

Tell us the surface and roughly how many square feet. A surveyor visits, checks the site properly, and you get a written quotation — no obligation.

Related

Other systems

All services
RCC

Roof waterproofing

Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.

Read more
GI

G.I. sheet waterproofing

Rust treatment, seam sealing and coating for corrugated galvanised iron warehouse and factory roofs.

Read more
AC

Asbestos sheet waterproofing

Cemented A.C. sheet sealing that stops seepage at the overlaps without replacing a single sheet.

Read more
TANK

Water tank waterproofing

Polymerised cementitious coating for overhead and underground concrete tanks. Safe with drinking water.

Read more
WhatsApp Call now