A reflective, UV-stable top coat that turns back more than 85% of incoming solar radiation instead of letting the slab absorb it. Measured 6–8°C lower surface temperature on real Karachi roofs in June.
Roof heat proofing in Karachi is a separate system from waterproofing, even though most clients end up getting both — a reflective, UV-stable top coat that turns back more than 85% of incoming solar radiation instead of letting the slab absorb it, measured at 6–8°C lower surface temperature on real Karachi roofs in June, not a lab figure. It applies over R.C.C., G.I. and asbestos sheet roofs alike, either together with roof waterproofing in the same visit or afterward on a roof that's already sealed. The same reflective chemistry is sold by the pail as ZEM-30 Heat Shield for owners who want to apply it themselves. Send us the roof's covered area and a surveyor confirms which system fits before any quotation is written.
Skipping a stage is how a waterproofing job fails in year two. This sequence is not negotiable on our sites.
We measure the existing surface temperature at midday before quoting, so the before/after comparison is real, not estimated.
Surface cleaned and primed so the reflective coat bonds properly, whatever the underlying material.
Applied evenly across the full roof, each coat allowed to cure before the next.
Surface temperature measured again in full sun and the drop recorded on the job sheet.
No — they solve different problems. Heat-proofing reflects solar radiation; waterproofing seals against rain. We usually recommend both together, but heat-proofing alone can go over an already-sound, dry roof.
The system is UV-stable and rated not to fade or lose reflectance for the stated warranty period, checked on our routine site visits.
In most cases yes, once we have checked the existing coat is sound and properly bonded. We confirm this on survey before quoting.
Yes. The same reflective system applies over G.I. and asbestos sheet roofs and is often the single biggest comfort improvement for a warehouse or shed.
| Client | Scope | Covered area | Duration | Handover |
|---|---|---|---|---|
| Frontier Corps South BalochistanTurbat, Balochistan | Roof waterproofing + heat-proof coating18 buildings | 68,000 sq.ft | 22 days | Feb 2020 |
| Pakistan Rice ComplexS.I.T.E. 2, Karachi | G.I. sheet waterproofingWarehouse | 28,000 sq.ft | 22 days | Jun 2019 |
| State Life InsuranceI.I. Chundrigar Road, Karachi | Roof waterproofing + heat-proof coating3 buildings | 26,000 sq.ft | 18 days | Sep 2021 |
| Fintex ManufacturingH.I.T.E., Hub | G.I. sheet waterproofingWarehouse | 14,000 sq.ft | 12 days | Aug 2020 |
| Hassan TextilesNew Karachi Industrial Area | Cemented asbestos sheet waterproofingTextile CMD | 9,400 sq.ft | 14 days | Sep 2020 |
Tell us the surface and roughly how many square feet. A surveyor visits, checks the site properly, and you get a written quotation — no obligation.
Water-based polymerised coating for new and old concrete roofs. Two-coat, or four-coat with cotton fabric reinforcement.
Read more GIRust treatment, seam sealing and coating for corrugated galvanised iron warehouse and factory roofs.
Read more ACCemented A.C. sheet sealing that stops seepage at the overlaps without replacing a single sheet.
Read more TANKPolymerised cementitious coating for overhead and underground concrete tanks. Safe with drinking water.
Read more